Services: Engineering Services

Substation Design
Downes Associates has planned and designed numerous electrical substations for municipals and cooperatives. We excel in providing total design packages.

Total Design
Our total design package begins with with an assessment of the owner's needs and ends with the final checkout of all the substation equipment. We are experienced in working alongside your staff complimenting their abilities to complete the desired goal on time and within budgetary constraints. Working closely with your staff provides for a cost effective design solution, while also developing additional capabilities for your staff.



Project Assistance
Maybe you don't need a total design plan. If there is one or more particular aspects of your substation project that your staff does not feel comfortable in designing, does not have time to design, or cannot cost effectively design at this time, contact Downes Associates. We will furnish a professional engineer or designer, specializing in the design task you are requesting help with. Always remember no project-related task is unimportant or too small. Each task in the process is an integral link in the chain. The total success of any project depends on successful completion of each project task.

Substations

List of Projects

  Pennsylvania Municipal
State Environmental Agency
Lower Delmarva Municipal
Lower Delmarva Municipal
Rural Electric Cooperative
Mid Delmarva Municipal
Mid Delmarva Municipal
Pennsylvania Municipal
Pennsylvania Municipal
Virginia Municipal
Western Maryland Municipal
Western Maryland Municipal
Western Maryland Municipal
Pennsylvania Municipal
Pennsylvania Municipal
Pennsylvania Municipal
Natural Gas Distribution Utility
Natural Gas Distribution Utility
Substation Evaluation
Correction Facility Protective Relay & Electrical System Study
Interconnection Circuit Switcher
Substation Design (New)
Substation Modifications
Substation Modifications
Substation Design (New)
Substation Modifications
Hospital Switchgear Modifications
Substation Upgrade
Moser Road Substation Design (New)
CAD Work on Old Sub Recloser Pad
Substation Upgrades
Substation Drawing Evaluation
Substation Breaker B960 Addition
Substation Design (New)
Switchgear Design and Specification
Switchgear Redesign

Substation Photos